Project preservation requirements:
The main preservations requrements for this project is to keep skyline proportion, thats mean front façade  should remain its height. Brick structure must be untached. One can add new structure, that climb thru façade but it must be an independent structure. All three front doors are historycity and have no architectural value.

Project Ambitions:
My project ambitions is to develop independent furniture-like structure, which fill interior space. The new form stays in oposition to existing building to expose each own values. Existing monument will perform as a decoration but the new developing function is inspired by the previous one. That is, ealier theatre costume magizine will transform to theatre costume exhibition space. New form addition is not wooden background for secession monument. It co-exist,penetrate,dally with it.


More soon..